Automatic Mill Roll Roller External Overlay Cladding Welding Machine
Feature of surfacing overlay welding machine
surfacing overlay welding machine consists of Electric deceleration head, fixture,conductive mechanism,welding torch clamping and adjustment mechanism,CNC axial moving mechanism, adjustable movable bracket,electric control system,welding power resource (hot wire TIG) and pneumatic system.
The rotation system of surfacing overlay welding machine consists of AC frequency motor, reducer, workpiece fixture and conductive sleeve. The speed adjustment is realized by adjusting the speed of the AC frequency motor through the inverter. The conductive sleeve is in the form of an elastic copper sleeve, and the copper sleeve is elastically coupled with the main shaft, and is filled with conductive oil, which is resistant to abrasion and has good electrical conductivity.
Parameter of surfacing overlay welding machine
Rotating Speed |
0.1-2r.p.m Stepless Adjustment |
Motor Capacity |
0.75KW |
Compressed Air |
0.4~0.6MPA |
Welding Torch Adjustment Lifting Distance |
100mm |
Welding Torch Adjustment Left-right Distance |
100mm |
Welding Torch Adjustment Dip Angle |
25°~ 60° |
Network Voltage |
380V±15% |
Welding Torch Pneumatic Feeding |
300 mm |
Workpiece Length |
500-6000 mm |
Clamping diameter |
50-400mm |
Service of internal welding machine
Warranty: 12 months from the date of Bill of Lading.
The Seller shall bear responsibility for the entire machineries normally working during 12 months from the date of Bill of Lading. During warranty period, if are damages and disorders of equipment due to machine quality, The Seller shall be responsible for replacement of the defective parts with new parts. The warranty shall also include performance functions as defined in the offer. In the case that there is any defect The Buyer shall inform The Seller in writing and photos of the broken parts. The Seller will assist and deal with such damages within 15 days from receipt of The Buyer's above information.
The Seller doesn't guarantee the spare parts which are easily worn out / damaged. The Seller deems it his responsibility to furnish The Buyer these spare parts at prices reasonable or agreed.
The Seller doesn't guarantee equipment in case faults caused by operators' improper operation or electric source's breakdown.
Service condition:
1) When Sellers send engineer to Buyer's place for Installation, Commissioning and training for the machine in this contract in Buyer's place, Buyer shall undertake all the relative fees like, all tickets, accommodation for Seller's engineers.
2) Seller shall, within one week of receiving the above information, provide the required and qualified personnel to undertake supervision of installation, commissioning and training.
3) If the Buyer needs the service after sales from Seller, then Buyer shall undertake all the relative fees, like Round Tickets, Accommodation, Internal and international transportation, Labour cost of engineers etc.
4) When the Seller's engineer carries out the services in Buyer's place, Buyer shall arrange a Translator that can speak Chinese for Seller's engineer.
5) Labour cost for engineers: 100.00 USD per person, per day.
CE Certification: